07456 518888 7 days, 8am–6pm Free quotes, usually from a few photos

How we work

Most worktops are fitted about 2 weeks after your first message, and the fitting itself takes a day.

  1. 01

    Send us a photo

    Call, fill in the form or WhatsApp a few photos. We can price most jobs without a visit.

  2. 02

    Written quote in 1–2 days

    The quote covers supply and fit. For bigger jobs we come out and look first, free of charge.

  3. 03

    Worktops delivered within 7 days

    Kitchens and wardrobes take as long as the supplier needs, and we give you that lead time with your quote.

  4. 04

    Most worktops fitted in a day

    The sink, tap and plumbing are connected before we leave.

Grey shaker island carcases in place before the worktops go on
Part way through a kitchen: the island carcasses in, before the worktops go on.
U-shaped shaker kitchen with white worktops cut ready for the sink
Worktops cut and fitted, ready for the sink to go in.

What you can expect from us

Written quote in 1–2 days

A written quote for supply and fit, usually within 1–2 days of hearing from you.

“Igor was prompt in responding to the advert gave a quotation over the phone.”

MyBuilder customer, Durham

Most quotes from photos

Send a few photos and rough measurements on WhatsApp. We visit for bigger jobs, or where the detail matters.

WhatsApp, any time

We read messages any time and reply in working hours, on the same number: 07456 518888.

“very polite and prompt in returning messages”

Steve P., Prudhoe

Open 7 days, 8am–6pm

We take calls and work at weekends too.

We turn up on time

We tell you when we're coming, and that's when we arrive.

“Turned up on time and completed the job quicker than expected.”

Ronnie, Sunderland

We tidy up

Dust sheets go down, the mess is cleared away, and the kitchen is left clean.

“used dust sheets and cleaned up afterwards.”

Chris H., Bishop Auckland

The old worktop goes with us

We take the old tops away, and we hold a waste carrier licence.

“all debris and old worktops/ sink were taken away”

MyBuilder customer, Seaham

Sink and tap back in the same day

On a worktop job the sink, tap and plumbing are connected before we leave.

“Igor made a fantastic job of fitting our new worktops, under mount sink and mixer tap.”

Harry, Rowlands Gill

Workmanship guaranteed

The terms are written on your quote.

All 173 reviews on MyBuilder ↗

A worktop swap takes a day

The old tops come out, the new ones go in, and the sink and tap are plumbed back in before we leave, so you have a working kitchen that evening.

A whole kitchen, a set of wardrobes or a staircase depends on the size of the job, and on the supplier or how long it takes to make. We tell you how long it will take when we quote. A large kitchen of 33 units, for example, took us 7 days.

Typical time on site by trade
TradeOn site
Kitchen worktopsUsually 1 day
Kitchen fittingAgreed on the quote
Fitted wardrobesAgreed on the quote
StaircasesAgreed on the quote
Furniture & joineryAgreed on the quote

The time we spend working in your home. Your written quote gives the dates for your job.

Want to talk it through?

Call 07456 518888, 7 days, 8am–6pm, or WhatsApp us any time.